11 wheel torque chart -18 – JLG M450 Operator Manual User Manual
Page 108
Advertising

SECTION 6 - GENERAL SPECIFICATIONS & OPERATOR MAINTENANCE
6-18
– JLG Lift –
3121210
2. Tighten nuts in the following sequence:
3. The tightening of the nuts should be done in stages. Fol-
lowing the recommended sequence, tighten nuts per
wheel torque chart.
4. Wheel nuts should be torqued after first 50 hours of opera-
tion and after each wheel removal. Check torque every 3
months or 150 hours of operation.
Table 6-11. Wheel Torque Chart
TORQUE SEQUENCE
1st Stage
2nd Stage
3rd Stage
40 ft. lbs.
(55 Nm)
100 ft. lbs.
(130 Nm)
170 ft. lbs.
(255 Nm)
Advertising
This manual is related to the following products: