9 inverter, 10 machine function speeds, 11 boom synchronizing procedure – JLG M450 Operator Manual User Manual

Page 57

Advertising
background image

SECTION 4 - MACHINE OPERATION

3121210

– JLG Lift –

4-11

Activation of the Manual Charge button will start the engine
and initiate the charging cycle even if the batteries are
charged above the level of automatic start. The operator can
initiate the charge cycle to charge the batteries to the maxi-
mum level. The charging cycle will include finishing phase
similar to conventional chargers.

4.9 INVERTER

The inverter converts 48 VDC to 110 VAC to allow operation
of power tools from the machine’s batteries.

• The inverter is operational when the emergency stop

switch is pulled out.

• The machine and inverter can be operated at the same

time.

• The inverter will shut off at approximately 42 VDC and stay

off until the emergency stop switch is recycled. It will oper-
ate again until voltage drops to 42 VDC.

• The machine will operate down to 36 VDC.
• The inverter will shut down if the high temperature light

indicated overheating. It will automatically turn back on
when cooled.

• The overload light indicates an output wiring short circuit

or a load that is too large for the rating of the inverter.

4.10 MACHINE FUNCTION SPEEDS

The Function Speed Control affects the speed of boom func-
tions Lower Lift, Telescope, and Rotate. Turn the control CW
to increase function speed or CCW to decrease function
speed. When in the CCW maximum position, Drive is placed
in creep speed.

4.11 BOOM SYNCHRONIZING PROCEDURE

NOTE: If the Lower Boom assembly does not fully lower:

1. Remove all personnel from the platform.

2. Pull the red knob located beside the main control valve.

3. From Ground Control, activate the lift control switch,

raise Lower Boom 1.8 m (6 feet).

4. After raising Lower Boom, release the red knob.

5. Activate Lower Boom Down, fully lower boom.

6. Repeat step 1 thru 5 if necessary.

Advertising
This manual is related to the following products: