4 commissioning, 1 available interfaces, 2 cable installation – ADS-TEC BPC1000 User Manual

Page 14: Ommissioning

Advertising
background image

Industrial PCs BPC1000

14

© ads-tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden-Echterdingen

4

C

OMMISSIONING

The power supply connection and interfaces of this device are installed at the device front

panel. All supply leads and all required data leads have to be connected before starting

commissioning.

Warning:

The device must be switched off before connecting or disconnecting any cables in order

to prevent damage to the electronics!
The device may only be switched on after acclimatising to the ambient temperature in

order to avoid condensate accumulation. Make sure to meet the permissible voltage

requirements for this device.
After switching off and before switching on you must wait for at least 5 seconds.

Note:
The screen of a data cable must always be connected with the connector housing (EMC).
Under the embedded operating system, interfaces must explicitly be enabled and required

drivers must be installed for being able to use them.

4.1 A

VAILABLE INTERFACES

PC

VERSION

I

NTERBUS VERSION

S

ERCOS VERSION

4.2 C

ABLE INSTALLATION

The BPC 1000 interfaces are installed in the front of the device. Install required data leads
and secure them against slipping out.


Advertising