3 operational readiness check, 4 plc switch, 5 status displays – ADS-TEC BPC1000 User Manual

Page 15: 6 plc led (two colors), Industrial pcs bpc1000

Advertising
background image

Industrial PCs BPC1000

© ads-tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden-Echterdingen

15

4.3 O

PERATIONAL READINESS CHECK

Connect the power cable to the power source.

Check the device to determine whether damages have been caused by improper

transport, incorrect operation or storage conditions or improper handling (e.g.
smoke emission from the device, etc.). If damages are found, immediately shut

down the device and protect it against unintentional startup.

4.4 PLC

SWITCH

The PLC switch is located underneath the cover at the front of the device.

The PLC software can be controlled by using the PLC switch. The function of individual

switch positions may vary depending on the software and PLC version used. Additionally,

you can read current status information by using the keys.

E

XAMPLE

:

SWITCH POSITION

DESCRIPTION

RUN / PROG:

Run or programming status

STOP:

PLC is stopped

MRESET:

The PLC is reset

4.5 S

TATUS DISPLAYS

SYS

LED

(

BICOLOURED

)

Depending on the colour and type of flashing different device states are displayed by the
SYS LED.

The following signals are displayed:

LED lights green

The device is ready for operation (Power ON).

LED flashes red

Environmental temperature too high.

LED is off

The device is switched off. (POWER OFF)

4.6 PLC

LED

(

TWO COLORS

)

This LED indicates the status of a soft PLC. A soft PLC has to be installed in order for this

LED to display various signals. Various device statuses are indicated by the colors and

flashing patterns of the PLC LED.

Advertising