2 order of installation, Industrial pcs mcr5000 – ADS-TEC MCR5000 User Manual

Page 13

Advertising
background image

Industrial PCs MCR5000

© ads-tec GmbH • Raiffeisenstr.14 • 70771 Leinfelden-E

3.2

O

RDER OF INSTALLATIO

The following must

Check the b

Monitor is p

Monitor wei

Monitor size

Installation
(0° with DV

Observe the

Note:
The maximum torq

installation. Tighten

Echterdingen

ON

be checked before starting the installation:

bearing capacity of the wall

ermitted for fixing with M6 screws by VESA 100/2

ght ≤ 50kg

e ≤ 50"

incline ≤ 30° from vertical line

D operation!)

e monitor data sheet!

que for fixing the MCR 5000 installation screws i

en screws evenly.

13

200

is 5 Nm for wall-mount

Advertising