SECURING THE 1st VERTICAL BEAM
ERECTING THE 2nd BEAM
ON THE LEADING 2-PC SAFETY WEBS,
WORKERS INSERT LOOSE ENDS OF UPPER
SAFETY WEBS INTO THE RATCHETS OF
THE LOWER SAFETY WEBS.
WITH 2nd BEAM SECURED, THE 1st BEAM
IS ROTATED TOWARD IT. 2 OR 3 WORK-
ERS SHOULD HOLD THE BEAM AT VERTICAL
UNTIL EAVE BARS (ER20) ARE INSTALLED.
USING RATCHETS, ADJUST LEADING AND TRAIL-
ING SAFETY WEBS AGAINST EACH OTHER ON BOTH
SIDES OF THE STRUCTURE TO SECURE AND VERTI-
CALLY ALIGN THE BEAM.
11
SECURING THE 2nd BEAM WITH DROP-IN RIDGE/EAVE BARS
DROP-IN RIDGE/EAVE BARS CON-
NECT 1st AND 2nd BEAMS. DROP
ONE HOOK END OF BAR INTO EAVE
FITTING. USE LIFTING CRADLES TO
POSITION 2nd END.
USE LIFTING CRADLES
TO POSITION 2nd END.
DROP ONE HOOK END
OF BAR INTO EAVE
FITTING.