2 heavy duty remote power unit, 5 accordion skirt installation, Heavy duty remote power unit – Autoquip Q-LIFT User Manual

Page 18: Accordion skirt installation

Advertising
background image

18

superior running characteristics, circuit components do not have to be as large as for standard
motors of equal delivered horsepower.

4.4.2 Heavy Duty Remote Power Unit

1. The Vertical 'HD' Power unit utilizes a 5 HP/ 208-230-460 Volt / 60 hertz / 3 phase Heavy Duty

motor, (with a 30 minute continuous duty rating). The power unit is coupled with a high-pressure
positive displacement gear pump, and Autoquip Corporation’s patented Deltatrol valve assembly.


2. The motor connection diagram should be referenced in connecting the motors to a power source.

Remember that heavy wire must be used all the way to the power source.

4.5 Accordion Skirt Installation

1. Position platform in raised position. Engage maintenance locks (see “Lift Blocking Instructions”

section). Position accordion with weight rod pocket at bottom and mounting collar at top. The
breathable material when provided must be positioned at top of skirt with mounting collar.


2. Slip skirt over end of platform. Turn skirt as required to slide over other end of platform and leg

assembly. The skirt should be in position under platform while enveloping base assembly.


3. Select from the following mounting configurations.

Mounting Accordion Skirt On Platform Side

Raise one side of skirt along with a skirt-mounting bar (1/8”
x 1”) to (1) side of platform. When possible, center skirt-
mounting collar and skirt-mounting bar (1/8” x 1”) on
platform side.

Align pre-drilled holes in side of platform with skirt-mounting
bar holes and punch holes in skirt-mounting collar.

Push a nylon drive rivet through each hole in skirt-mounting
bar. Hammer aluminum pin into rivet until flush with rivet
head. Repeat mounting process for remaining sides of
accordion skirt.

Mounting Accordion Skirt Under Platform

Raise one side of skirt along with a skirt-mounting bar (1/8" x
1") to underside of platform skirt support bar. When possible,
center skirt-mounting collar and skirt-mounting bar (1/8” x 1”)
on platform support bar.

Align pre-drilled holes in skirt support bar with skirt-mounting
bar holes and punch holes in skirt-mounting collar.

Push a nylon drive rivet through each hole in skirt-mounting
bar. Hammer aluminum pin into rivet until flush with rivet
head. Repeat mounting process for remaining sides of
accordion skirt.

Advertising