Installation – CHAMPION EEUCCW8 User Manual
Page 28

20
Installation
Installation
Steam Connections
A
B
1. The specific steam requirements for the
installation of the dishwasher are listed on
the Plumbing and Electrical Diagram
(P& E) that was provided prior to the installation.
2. It is recommended that the Installation Supervisor
inspects the position, level and alignment of the
piping prior to making the connections.
3. The main steam supply connection is located
underneath the unload section of the dishwasher
as shown in (A).
4. Connect the steam supply piping and steam
condensate lines (B) located between the dish-
washer sections. Make sure all fittings are tight.
5. The steam condensate line may be run to a drain
or to a boiler return line. If plumbing to a boiler
return line make sure that there is no back-
pressure on the condensate line. Connections
to the building condensate return is performed by
others.
Vent Connections
1. The specific venting requirements for the installation of the dishwasher are
listed on the Plumbing and Electrical Diagram (P& E) that was provided prior
to the installation. Vent connections to the dishwasher are performed by
others.
2. Install the dishwasher vent stacks on the load and unload end of the
dishwasher so that the vent handles are facing the front of the dishwasher.
3. Set the vent damper adjustment handles in the vertical position as shown in
(A). This sets the vent damper in the fully open position.
4. There is a vent fan signal connection point located inside the top-mounted
control cabinet to interlock the building vent system with the dishwasher
operation. See (B).
NOTE:
This is a 120VAC signal only and cannot be used to power vent
motors or other control circuits.
A
SIGNAL ONLY
VENT FAN
COMMON
COMMON
120V
DETERGENT
120V
RINSE AID
120V
B