Sheet9, Drawing view40, Drawing view41 – ERICO IJS100 Insulated Joint Slotter User Manual
Page 9

Figure 21: Move the gear rack to beginning of cut position
Gauge side
of the rail
Field side
of the rail
Figure 22: Beginning of cut position
7. Move the gear rack back to the beginning of cut position
a. Turn the worm drive shaft clockwise (Figure 21) until the gear rack has moved to the
beginning of cut position (Figure 22). Care should be taken that the rack gently reaches its end
of travel position, as the drill will twist abruptly.
8. Turn the height adjustment knob clockwise until the cutting tool is resting on the head of
the rail (Figure 23). The Insulated Joint Slotter is now ready to cut.
TECHNICAL SUPPORT:
www.erico.com
IP8240_B
INSTRUCTION SHEET
9 OF 10
CADDY, CADWELD, CRITEC, ERICO, ERIFLEX, ERITECH, and LENTON are registered trademarks of ERICO International Corporation.
© 2012 ERICO International Corporation.