Soft ceiling tile installation, Occupancy sensor – ETC Unison Paradigm Occupancy Sensor User Manual

Page 4

Advertising
background image

E T C I n s t a l l a t i o n G u i d e

Occupancy Sensor

Occupancy Sensor Installation Guide

Page 4 of 8

Electronic Theatre Controls, Inc.

Soft Ceiling Tile Installation

Step 1:Pull the Belden 8471 (or equivalent) and 14 AWG (2.5mm

2

) ground wire to the

installation location.

Step 2:Orient the smooth side of the mounting plate to the ceiling tile and insert the

soft ceiling tile adaptor through the two small holes near the center of the
mounting plate.

Step 3:Poke the adaptor tines through the ceiling tile, then bend each tine over in

opposite directions for a secure fit.

Step 4:If you are installing the sensor in series with other sensors or stations

(continuing the data run), use the provided LinkConnect pigtail, ESD ground
wire pigtail and WAGO connectors to make the terminations. If you are not
continuing the data run
, proceed to step 5.

poke the adapter through the ceiling tile, then bend

it over for a secure fit.

LinkConnect pigtail and

WAGO connectors

(optional use)

terminate

wires here

install

ed control

wire

installed control wire to next stati

on

sensor pigtail

a: Strip 3/16” (5mm) of insulation from each installed wire.
b: Open the three terminal levers on a WAGO connector

and insert the installed (typically black) Belden 8471
LinkConnect wire, the black lead from the sensor pigtail,
and the continuing Belden 8471 (typically black) wire
into the terminals.

c: Close the levers onto the wires.
d: Repeat the above for the installed (typically white)

Belden 8471 LinkConnect wire and the remaining pigtail
from the sensor, as well as the ESD ground wires using
a new WAGO connector for each termination type.