3.0 Cable Installation and Operating Procedure
MID POINT INSTALLATION


It is important that all personnel using or maintaining this equipment be fully trained,
competent and have read the entire operating manual. General Machine Products
cannot be held responsible for misuse of this equipment.

3.1

IMPORTANT: Before installation of the cable as in (Fig 1), a suitable length of
Innerduct should be connected between the Tornado Blowing unit and the
innerduct in the ground using a split duct coupling to connect the two. Ensure
the length of Innerduct is long enough to allow connection to the fleeter’s Duct
Clamp
on completion of the first stage of installation.

a) Position the Cable Fleeter in line and adjacent to the manhole (Fig 1) and

leveled up by adjusting the rear props and the jockey wheel until the level
bubble is centered.

Continue with first stage installation.

Fig 1