I-Joist Storage and Handling

Safety

1. Walking on the joists should not be permitted until they are properly braced.

2. Lateral restraint, such as an existing deck or braced end wall,

must be established at the ends of the bay. Alternatively,

temporary or permanent sheathing may be nailed to the first

4 feet of the joists at the end of the bay.

3. All hangers, rim boards, rim joists and blocking at the supports

of the joists must be installed and nailed properly.

4. During installation, a minimum 1x4 temporary brace at least

8 feet long is required. Temporary bracing members should be

spaced at no further than 10*-0( o.c. and nailed to each joist

with two 8d nails (10d box nails if bracing thickness exceeds 1().

Lap bracing ends and anchor them to temporary or permanent

sheathing. Remove the temporary bracing as the permanent

sheathing is attached.

5. The ends of cantilevers must be temporarily braced on both

the top and bottom flanges.

6. Never overload sheathed joists with loads that exceed

design loads.

7. Do not ship or install any damaged I-joists.

8. When stacking construction material, stack only over

beams or walls, NOT on unsheathed joists.

Align stickers

one above

the other

Hard, dry,

level surface

10

*

max.

10*-0(

max.

1. CAUTION: Wrap and joists are slippery when icy or wet.
2. Store bundles upright on a smooth, level, well-drained and supportive

surface to protect from the weather (sun and precipitation). Keep covered
and strapped until installed.

3. Keep bundles above ground to minimize the absorption of ground moisture

and allow air circulation.

4. Re-cover unused products with bundle wrap. Repair damage to bundle

wrap with tape, more bundle wrap, plastic or weatherproof covering.

5. Place 2x or LVL spacers (at a maximum of 10* apart) under bundles

stacked on the ground, and between bundles stored on top of one another.

6. All handling of joists with a forklift or crane should be done carefully by

lifting from below the bottom of the bundle.

7. Joists should remain upright (web vertical) during handling.
8. Avoid excessive bowing during all phases of handling and installation

(i.e., measuring, sawing, or placement).

9. Damage may result if the I-joist is twisted or a load is applied to it

while it’s lying flat.

10. An MSDS is available at www.builditbetter.com.
11. When handling I-joists with a crane on the job site (“picking”), take a few

simple precautions to prevent damage to the I-joists and injury to your
work crew. Pick I-joists in bundles as shipped by the supplier. Orient the
bundles so that the webs of the I-joists are vertical. Pick the bundles at the
5th points, using a spreader bar if necessary.

installation Guide

GP Lam

®

LvL

®

wood I beam

JoIStS

®

fIberStronG

®

rIm board

®

wHat you don’t

See matterS

united states Installation Instructions

for residential floor Systems

Advertising