Assembly guide – Bowflex Elite™ Plus home gym User Manual

Page 6

Advertising
background image

A-4

Step 3 - Attach the Squat Platform to the

Main Assembly

Locate the following items:
• From Step 2 - Base Platform/Lat Tower (Main) Assembly

• Item #5 - Squat Platform

• Item #I - (2) 3/8" X 3 1/4" Button Head Screws

• Item #N - (4) 3/8" Washers

• Item #O - (2) 3/8" Nylock Nuts

• Item #Q - (4) Bolt Covers

With the Base Frame/Lower Lat Tower (Main) Assembly

(from Step 2) on the floor, carefully lift up the front of the

unit, then slide the Squat Platform (Rubber-pad side down)

underneath both Legs.

Line up the bolt holes in the brackets on the Squat

Platform with the bolt holes on each Leg (directly behind

the pulleys), as shown in Figure 3a.

Place (2) 3/8" Washers (Item #N) over the ends of (2) 3/8" X 3

1/4" Button Head Screws (Item #I) - one washer per screw.

Insert the screws through the lined-up holes as shown, then

place (2) 3/8" Washers and (2) 3/8" Nylock Nuts (Item #O) over

the end of each screw, securely tightening them in place.

Completely tighten hardware installed during Step 3.

Place (2) Bolt Covers (Item #Q) over the Nylock Nuts installed

in this step - one cover per nut. Then, place (2) additional Bolt

Covers over the J-bolts, one cover per bolt, that attach the

Pulleys to the Leg, as shown in Figure 3b.

Figure 3b

Q

Figure 3a

O

5

Base Platform/Lower

Lat Tower Assembly

N

I

Squat

Platform

Brackets

Bolt

Holes

Leg

Assembly Guide

Advertising