Cascading, 2 electrical installation – Lenze E94AZCEH User Manual

Page 22

Advertising
background image

2 Electrical installation

Cascading

EDK94AZCEH DE/EN/FR/ES/IT 1.0

22

H2_Kaskadierung-Schalterstellung

Cascading

Use the uplink port A1 to cascade the hubs:

E94AZCEH003

The hubs can be connected using a patch or a crossover cable.
Use the MDI / MDIX switch to select the uplink mode as shown in the following figure:

Patch cable

Crossover cable

E94YCEH005

Advertising