4 mechanical installation, Motor mounting, Preliminary works – Lenze E82ZMBRB User Manual

Page 33: Mechanical installation

Advertising
background image

Mechanical installation

Motor mounting

4

EDK82ZMBRB DE/EN/FR 1.0

33

l

H1_MechINS−E82ZMBRB_motmont_motec_EN

4

Mechanical installation

Motor mounting

Preliminary works

8200mot139

1. Dismount motor terminal box.
2. Dismount motor terminal board.
3. The motor connections must be approx. 15 cm long, if necessary, extend them.