Electrical installation

Important notes

6

l

28

LDEDS−CCU210B EN 4.0

EMC−compliant wiring

)

Note!

In order to ensure the trouble−free operation of Lenze control systems on
monorail overhead conveyors, an EMC−compliant installation is requried. This
includes the following:

ƒ

Conduct the motor cable as described in the technical data.

ƒ

Install the motor connection cables (connections U, V, W) separately from
the sensor cables:
– Do not use a common cable duct.
– Do not lay the cables in parallel over longer distances.
– Minimum distance 10 cm.
– Keep the motor cable as short as possible.

ƒ

Lay the supply cables for the sliding contacts of the bars separately to the
sensor cables:
– Do not use a common cable duct.
– Do not lay the cables over longer distances.
– Minimum distance 20 cm.

ƒ

Connect control and data cable shields at both ends.

ƒ

Prevent the formation of loops of the sensor cables when cables are too
long:
– Conveniently trim the sensor cables or directly lay them in the wire

harness by folding them up and interconnecting them using a cable tie, in
order to avoid interferences and magnetic inductions.

ƒ

Earth the MOC vehicle directly via the earthing brushgear:
– Connect all movable parts to the cross beam or the main beam in a

low−resistance manner.

– Use copper braid strap or drain wire 4 mm

2

.

ƒ

Series connections of the earthing are allowed:
– If a movable part is earthed, the proximate movable part can be earthed

on the previous movable part.

– For instance in the case of carriages, you can like this establish a closed

and low−resistance connection from the cross beam to the main beam
which the control is connected to, via several PE connections from the
motor bracket, control beam, front and rear carriage.

ƒ

The responsibility for the compliance with the EMC Directive in the machine
application lies with the user.