Loadstar Sensors StockVUE Inventory Management System User Manual

Page 2

Advertising
background image

Loadstar Sensors, Inc. •

www.loadstarsensors.com

2


C.

If you have more than 12 load cells, then you need to daisy chain the SC-1200s. Connect
SC1200-Master’s Downlink-A to SC1200-Slave’s Uplink-Y (as shown below).

Each load cell/bin combination is uniquely identified with a 8 character identifier, for example,

M50.R00.C00.S01, M50.R00.C00.S02, ...S03

, etc. This depends only on the port it is

connected to, not to the scale itself.

Attach the cable from the bin marked “…S01” to port number 1 of the SC-1200,

Attach the cable from the bin marked “…S02” to port number 2 of the SC-1200, and
so on.

The photo below shows 10 bins connected.

Advertising