Operating procedure – Marshalltown DL11 Drywall Lift User Manual

Page 5

Advertising
background image

4

Phone 800-888-0127 / 641-753-5999 • Fax 800-477-6341 / 641-753-6341 • www

.MARSHALLTOWN.com

4

Phone 800-888-0127 / 641-753-5999 • Fax 800-477-6341 / 641-753-6341 • www

.MARSHALLTOWN.com

5

BASE

ASSEMBLY

LOCATING

POST

OPERATING PROCEDURE

ASSEMBLING DRYWALL LIFT

TO ASSEMBLE YOur LIfT:

1. Open the legs on the base assembly to their operating postion. Make sure the spring

loaded plungers are fully engaged and are locked securely in position.
2. Place the mast assembly firmly into the base. Make sure the mast locating ring is firmly

seated onto the base locating post.

Your MARSHALLTOWN Drywall Lift will arrive in three section, the Base, the Mast and

the Cradle. Complete assembly will take less than five minutes.

BASE

MAST

CrADLE

MAST

LOCATING rING

2

1

Advertising
This manual is related to the following products: