Marshalltown DL11 Drywall Lift User Manual

Page 9

Advertising
background image

8

Phone 800-888-0127 / 641-753-5999 • Fax 800-477-6341 / 641-753-6341 • www

.MARSHALLTOWN.com

8

Phone 800-888-0127 / 641-753-5999 • Fax 800-477-6341 / 641-753-6341 • www

.MARSHALLTOWN.com

9

EXTENDING LOAD RAILS

The load rails can be extended to help support

wide loads.

TO EXTEND ThE rAILS:

1. Pull the ring on the spring loaded plunger and

slide the rail out. The spring loaded plunger will

engage in the next available position.

WARNING

!

The spring loaded plunger must be fully engaged prior to lifting a load.

WARNING

!

Never lift a load without ensuring it is properly balanced and

supported on the cradle.

LOAD SUPPORT HOOKS

TO POSITION ThE LOAD SuPPOrT hOOkS IN OPErATING POSITION:

1. Pull the ring on the spring loaded

plunger and rotate the hook from the

stowed position. Ensure that the spring

loaded plunger is fully engaged prior to

loading drywall onto the lift. NEVER

ATTEMPT TO LIFT A SHEET OF

DRYWALL WITHOUT POSITIONING

THE LOAD SUPPORT HOOKS IN THE

OPERATING POSITION.

LOAD SuPPOrT hOOk

WARNING

!

Attempting to lift a sheet of

drywall without using the

load support hooks can

result in injury.

WARNING

!

Atempting to lift more than

one sheet of drywall can

result in injury

Advertising
This manual is related to the following products: