Mayline Dual Base Only User Manual

Page 3

Advertising
background image

(3)

NOTE:

#10 X 3/4" Screws (E3) are provided
for Clamp and Control Box installation
only.
#10 x 1" Screws (E4) are provided for
Work Surface attachment only.

7. PRIOR TO ATTACHING A

WORKSURFACE. Place the Memory

Switch cable over the top of the Cross
Channel.

8. Align the holes in the Top with the holes

in the Top Plates (4) and secure in place

with eight #10 x 1" Screws (E4).

9. Align the holes in the Control Box (5)

with the holes in the underside of the Top

and attach it with four #10 x 3/4" Screws
(E3). Connect the cables to the columns.

10. Place the Memory Switch (6) in a

comfortable and accessible location on the

underside of the Top and attach it with two

#6 x 5/8 Screws (E5).

11. Route the actuator column cables and

the switch cable away from moving
components and secure them in place with

Cable Clamps (E6) and Screws (E3).

ATTENTION:

MAYLINE includes screws for the installation of a Work
Surface with a minimal thickness of 1 inch (25.4mm).

Advertising