Step 3 step 4, Post frame panel installation – Metal Sales Pro-Panel II Installation User Manual

Page 30

Advertising
background image

© Metal Sales Manufacturing Corporation / Subject to change without notice / Effective 5/09.

29

POST FRAME

& RESIDENTIAL

POST FRAME PANEL INSTALLATION

FIRST PANEL INSTALLED

1. Apply a row of Tape Sealant across and over the ribs of the eave panel about 3" from panel end.

2. Install the ridge panel over the eave panel and Tape Sealant with a 6" Endlap. Fasten through both

panels and Tape Sealant into support with appropriate amount of fasteners to meet local building

code. (See fastening patterns on pages 13 and 14). Fasteners must penetrate sealant.

3. After securing panel, repeat the fastening pattern at all panel support locations.

INSTALLING SIDELAP PANEL

1. Place the lapping seam of the second panel on top of previously installed panel so that panel ends

are flush at eave (See below).

2. Fasten through panel, closure, and Tape Sealant into support with appropriate amount of

fasteners to meet local building code. (See fastening patterns on pages 13 and 14). Fasteners must

penetrate closure and sealant.

3. After securing panel, repeat the fastening pattern at all panel support locations.

STEP

3

STEP

4

INSTALLING ENDLAP PANEL

STITCH SCREW

RIDGE PANEL

EAVE PANEL

TAPE SEALANT

FASTENER

INSIDE CLOSURE

FASTENER

SYPHON

GROOVE*

6"

LAP

*PANELS WITHOUT A SYPHON

GROOVE REQUIRE TAPE

SEALANT IN THE SIDELAP

(IF REQUIRED)

Advertising
This manual is related to the following products: