MTS Series 642 Bend Fixtures User Manual
Page 30
Advertising
![background image](/manuals/567985/30/background.png)
Series 642 Bend Fixtures Product Information
30
Installation
1. Position the crosshead and actuator.
A. Switch on electrical power at your test controller.
B. Apply high hydraulic pressure to the load unit.
C. Position the crosshead and actuator for easy bend fixture installation.
D. Make sure that the crosshead is locked.
E.
Turn off hydraulic pressure.
2. Prepare the mounting hardware.
Force Transducer
Upper Bedplate
Mounting Screw
Lower
Bedplate
Mounting
Screw
Actuator
Advertising