Moving the integrated operations platform, Unloading, Moving the integrated operations platform 12 – MTS Criterion 60 - Lifting and Moving Instructions User Manual

Page 12: Unloading 12

Advertising
background image

MTS Criterion™ Series 60

12

Moving the Integrated Operations Platform

Lifiting and Moving Instructions

Moving the Integrated Operations Platform

Unloading

Choose suitable slings according to the Integrated Operations Platform and crate
weight. Wrap the sling through the crate pallet and raise it.

Moving the Integrated Operations Platform to Its Final Location

To move the Integrated Operations Platform:

1. Unpack the Integrated Operations Platform.

2. Choose suitable chains according to the Integrated Operations Platform

weight.

Advertising