Moving the Integrated Operations Platform

MTS Criterion™ Series 60

Lifiting and Moving Instructions

13

3. Attach the chains to the customer-supplied hoist rings (M16) on the

Integrated Operations Platform and hang the other end to the hook.

Note

Verify the capacity of the overhead crane.Be absolutely careful not to
stop or transit within the field of action of the overhead crane.

4. Raise the hook slowly and move the platform to its final location.

5. Put the platform down and take off the chains. Adjust the levelness with the

feet under the platform.

6. Contact MTS Systems Corporation to arrange for installation services.

Note

If you can guarantee a safe environment, other tools, such as a platform
vehicle or pallet jack, can also be used to move the Integrated
Operations Platform to its final location. Safety guidelines for these
methods are not provided in this manual, but you will need to be aware of
safety precautions if using these methods.

Hoist Rings M16