MTS Criterion 60 - Lifting and Moving Instructions User Manual

Page 8

Advertising
background image

MTS Criterion™ Series 60

8

Moving the Load Fame

Lifiting and Moving Instructions

5. When the frame is stable in the upright position, lift it to the final location.

6. Move the load unit to its final location and secure the frame to the

foundation. Refer to either

“Moving the Load Unit with a Forklift”

on page

9 or

“Moving the Load Unit with an Overhead Crane”

on page 9.

Advertising