Initial setup, Initial setup 30 – MTS 85X Damper User Manual
Page 30
Advertising
Damper System Operation
30
Initial Setup
Operation
Initial Setup
The initial setup tasks include the following:
•
Determine what types of fixtures/grips will be needed to secure the
specimen into the load frame.
•
Determine the position of the load frame crosshead.
•
Prepare the fixtures/grips, specimen, and data acquisition transducers.
•
Ensure that the load cell is properly rated for the test and that it is aligned
with the actuator.
•
Ensure the appropriate servovalve configuration is set up properly.
•
Ensure that the servovalve and feedback control cables are properly
connected.
Detailed information on these tasks can be found in the load frame product
manual.
Advertising