Initial setup, Initial setup 30 – MTS 85X Damper User Manual

Page 30

Advertising
background image

Damper System Operation

30

Initial Setup

Operation

Initial Setup

The initial setup tasks include the following:

Determine what types of fixtures/grips will be needed to secure the
specimen into the load frame.

Determine the position of the load frame crosshead.

Prepare the fixtures/grips, specimen, and data acquisition transducers.

Ensure that the load cell is properly rated for the test and that it is aligned
with the actuator.

Ensure the appropriate servovalve configuration is set up properly.

Ensure that the servovalve and feedback control cables are properly
connected.

Detailed information on these tasks can be found in the load frame product
manual.

Advertising