How to connect the cables, How to connect the cables 26 – MTS Series 256 Servovalve User Manual

Page 26

Advertising
background image

Series 256 Servovalve Product Information

26

Installation

10. Apply high pressure and check for leaks at the servovalve hydraulic

connections and at the base of the servovalve.

How to Connect the Cables

The following figures show the pilot stage internal coils and connector wiring
and the three cable wiring variations that can be used. (The main stage LVDT
internal coils and connector wiring.)

Pilot Stage Coils and Connector

LVDT Coils and Connector

25 mA

Series

A
B

C
D

Differential

50 mA/0 mA

0 mA/50 mA

A
B

C
D

Coils

Connector

A
B

C
D

80W

80W

A

B

C

D

backshell

7
9

11

12
13

Drain
+Valve Command 1
- Valve Command 1
+Valve Command 2
- Valve Command 2

MTS Controller

Single

Servovalve

A
B
C

D

Parallel

50 mA Total

A
B

C
D

Output

-FB

-EX

A

B

D

C

Excitation

+FB

+EX

Note

C and D leads may be reversed
for proper phasing.

Advertising