Retsch BB 200 User Manual
Page 18
![background image](/manuals/571049/18/background.png)
04/05/2012
Retsch GmbH
18
Replacing the breaker jaws
Fig. 10
The stationary breaker arm S can be removed to provide
sufficient space for dismantling the machine. Fig. 10
*
Unscrew the machine screws F.
*
Swing back the fill hopper B.
*
Grasp the breaker arm S at the grip and pull out the pin
Q.
*
Lift out the breaker arm S.
*
Unscrew the machine screws I.
*
Remove the clamping shims H.
*
Replace the breaker jaws J.
*
Assemble in reverse order.
*
Set the gap width as described in this instruction manual.
!
The fill hopper may be swung back (by unscrewing the two
machine screws) only by trained personnel and only for
cleaning purposes. Operating the BB 200 without these
machine screws in place and tightened down properly is
absolutely prohibited.
Hazard of pinching fingers and hands!
Copyright
Reproducing or distributing this documentation, utilizing or
distributing the contents is permitted only with the express
consent of Retsch GmbH.
Non-compliance will subject violators to claims for damages.
Modifications
Subject to modification without prior notice.