Start up – RKI Instruments 61-1001RK-05 User Manual
Page 9
Advertising
61-1001RK-05 Combustible Gas Detector• 5
Figure 3: Wiring the Hydrogen Detector to a Controller
Start Up
This section describes procedures to start up the hydrogen detector and place the detector
into normal operation.
Introducing Incoming Power
1.
Complete the installation procedures described earlier in this manual.
2.
Verify that the power wiring to the controller is correct and secure. Refer to the
controller operator’s manual.
WH ITE
Hydrogen Detector
Controller LEL
Detector Terminals
Detector Wires
Green
Red
Black
Whi te
Terminal Stri p
GREEN
BLACK
RED
J-box
Advertising