Warning – Schwank ecoSchwank-X 52 User Manual

Page 20

Advertising
background image

ECO-X 36-52 / IL-X 150-200 Manual
IM100116
RD: MAY 2009
RL: 05A - BA

20

12. LIGHTING INSTRUCTIONS

A Open the isolation valve in the main gas line and turn gas control knob on the combination

gas valve to the “ON” position.

B Switch on electrical circuit by turning the thermostat to the highest temperature setting.
C The heater should attempt ignition and remain lit within thirty seconds. Note that the corre-

sponding exhaust fan is operating properly.

D If ignition does not occur, then cut off electrical power by turning the thermostat to off posi-

tion.

E Allow a 5 minute complete shutoff period before relighting the heater

A. Turn off electrical circuit for temporary shutdown.
B. Turn off the electrical circuit, close gas stop-cock in gas supply line, and turn gas control knob to

the “OFF” position for complete shut-down.

13. SHUT DOWN INSTRUCTIONS

If heater back-fires during operation it must be turned off
immediately.

Indication of back-firing

:

A. Loud ignition noise, then followed by dis-

tinct hissing sound.

B. Little or no visible burning on the ceramic

tile.

C. Combustion is taking place inside the

burner body.

Cause & remedy of back-firing

:

A. Improper gas pressure entering the venturi

tube = test & remedy gas pressure.

B. Breakage of a ceramic tile and or gasket =

replace damaged part.

C. Faulty sealing of the ceramic tile to the

burner body, caused by breakdown of gas-
ket material = contact your Schwank dis-
tributor.

WARNING

Advertising
This manual is related to the following products: