Schwank STSp-WP User Manual

Page 8

Advertising
background image

SP-MSWP-BX-09A

STSp-WP Manual

RD: MAY 2004

RL: 9

KH

Page 4

MODEL

MOUNTING

HEIGHTS

(FEET)

MAXIMUM

DISTANCE

BETWEEN

HEATERS (FEET)

DISTANCE – OUTSIDE WALL

TO HEATER LONG AXIS

PARALLEL TO WALL (FEET)


HORIZONTAL ANGLE

STSp200-WP

18 – 25

50

17 – 25







COMBUSTIBLE

CLEARANCE

STSp175-WP

18 – 25

50

17 – 25

STSp155-WP

16 – 21

45

15 – 20

STSp130-WP

15 – 21

40

15 – 20

STSp110-WP

13 – 19

35

13 – 18

STSp80-WP

10 – 16

30

12 – 16

STSp-60-WP

8 – 14

25

11 – 15

5. PRE-INSTALLATION SURVEY

The Schwank STSp-WP heating system
must have gas piping of the correct diameter,
length, and arrangement to function properly.
For this reason, a layout drawing is neces-

Carefully survey area to be heated. For best
results, whenever possible, place burner and
combustion chamber in coldest area.

6. MOUNTING CLEARANCES

This heater must be mounted with minimum
clearances between the reflector surface and
combustibles, as shown in FIGURE 1 (page
5), TABLE 3 (page 5).
For recommended heater placement, refer to
TABLE 2 (below).

Heater position relative to building
construction and equipment must provide a
minimum clearance of 24 inches from the end
of burner housing to allow for servicing and
cleaning of burner, blower and controls.

TABLE 2 RECOMMENDED HEATER PLACEMENT FOR INDOOR APPLICATIONS

IMPORTANT: Continuous operation of single or multi-heater

must not cause combustible material or materials

in storage to reach a temperature in excess of 160

O

F.

Advertising