Cd e f – Stack-On GCD-924-5 4943-0707 User Manual

Page 2

Advertising
background image

7

INSTALLATION OF GC-900-5 or GC-500-5 PISTOL-AMMO CABINET

ON TOP OF SECURITY CABINET

NOTE: The GCD-924-5 security cabinet must be installed as described above.

Remove the top hole plugs from the cabinet by pushing out from the inside of the cabinet.

Place the Pistol-Ammo cabinet on top and assemble with (2) 1/4-20 nuts and bolts. Do not

tighten bolts. (Figure 7)

Drill (4) 3/16" pilot holes into the wall studs and secure the cabinet to the wall using (4) lag

bolts and washers. (Figure7)

Tighten the (2) bolts that connect the cabinets.

STACK-ON PRODUCTS COMPANY

P. O. BOX 489

WAUCONDA, IL 60084

4943-0707

2 12

5

6

FOAM INSTALLATION

Install the foam lining as shown in figure 5.

First place the bottom foam (C) in the cabinet.

Next install the lower side pads (D). Remove the upper 2" of backing from the

pad. Gage to the barrel rest and remove the remaining backing while pressing

the foam into place.

Apply the top side foam (E). Gage to barrel rest and work up.

Place shelf foam (F) on shelves.

C

D

E

F

INSTALLATION OF SCOPE STAND-OFF

NOTE: The scope stand-off will function properly for many combinations of guns with

scopes.

Screw the scope stand-off into the pilot hole of the barrel rest. (See figure 6)

IMPORTANT

Keep keys away from children. Keep this record of your serial and key

numbers in a secure place separate from your security cabinet. If you

lose your keys you will need this information as a reference for obtaining

new keys. To order a replacement key set, follow the instructions on the

attached form.

Advertising