Mise en route start-up inbetriebsetzung – Sulky VISION 1 DPB User Manual

Page 37

Advertising
background image

Select the EPAN menu

Check that: • the fertiliser selection is correct,

• hydraulic shutters are closed,

Select

et execute the fixed station trial.

Select the dose/ha:

use the numeric pad directly, validate by

.

You are spreading in DPA mode.

You can modulate the dose/ha: select

or

and return to baseline flow rate by selecting

.

You can start the TRIBORD or select

to modulate the RH side or select

to modulate the LH side.

Return to the same the same left/right dose by selecting

.

37

Mise en route

Start-up

Inbetriebsetzung

Select the REG menu.

Make sure that all parameters are correctly entered and saved : rate coefficient

and working width

.

Select your fertilisers

.

A

1

2

3

Select the INFO menu.

Select the PAR/TOT mode.

Reset each counter to zero with the RAZ or RESET function.

Upon hearing the first sound alarm and watching a bell appearing on the screen, select

to know the cause(s).

Select OK to return to the baseline menu.

Select

if you want to save your work.

B

1

2

3

4

5

C

1

2

3

4

5

6

GB

Advertising