1. S

tructo

-c

rete

structural concrete panel layout and replacement:

When laying out the placement of panels on the floor frame, the first row width should be set to insure that

the last row width is 24 in. wide minimum. Also, the length of the beginning and ending panels must span
at least three joists.

When replacing a damaged panel the same rules apply.

Do not install panels that are less than 24 in. wide. The minimum length of panels is controlled by the

joist spacing. On framing 16 in. o.c., the minimum length is 32 in. and on 24 in. o.c. framing, the minimum
length is 48 in.

2. Application of finished flooring:

Do not install any finished flooring materials over S

tructo

-c

rete

panels that are wet or frozen. Remove all

dust from the panels with a vacuum prior to installing the finished floor.

Panels should be allowed to acclimate to in service conditions for a minimum of 48 hours.

Ceramic tile, sheet vinyl and vct applied to S

tructo

-c

rete

panels should be applied over a tile underlayment,

crack isolation membrane or L

eveLrock

®

floor underlayment. Do not apply directly to the S

tructo

-c

rete

structural concrete panels.

Engineered wood floors as well as carpet and pad may be installed directly over S

tructo

-c

rete

panels.

Note In low traffic areas S

tructo

-c

rete

does not require a floor covering for a finished floor. When no floor

covering is used, USG recommends that the S

tructo

-c

rete

panel be sealed with an acrylic concrete sealer

to protect the surface. Acrylic concrete sealers are made by many manufacturers including Valspar and
Sherwin-Williams

®

.

3. Precautions in unloading and handling pallets of S

tructo

-c

rete

structural concrete panels:

Pallets of S

tructo

-c

rete

structural concrete panels weigh over 3000 lbs. and must be unloaded properly from

the delivery truck to avoid damage to the panels (especially the tongue and groove edges). It is recommended
that a fork lift be used to unload the pallets.

Pallets should be stacked in a level location and no more than four pallets high to prevent toppling of the units.

When a crane is used to unload the units from the truck or to lift units (or partial units) from the ground to the

desired application location—in addition to all the normal safety precautions used for crane operations—it is
recommended to use spreader bars with lifting hooks to minimize bending of the pallets and damage to the
tongue and groove edges.

Structo-Crete

Structural Concrete Panel

Tip Sheet

Good Design Practices

Manufactured by

United States Gypsum Company

550 West Adams Street

Chicago, IL 60661

SCP12/11-11
© 2011, United States Gypsum Company
Printed in U.S.A.

caused by application of these

goods not in accordance with

current printed instruction or

for other than the intended

use. Our liability is expressly

limited to replacement of

defective goods. Any claim

shall be deemed waived unless

company: L

eveLrock

,

S

tructo

-c

rete

, USG, USG in

stylized letters.

Notice

We shall not be liable for

incidental or consequential

damages, directly or indirectly

sustained, nor for any loss

Product Information

See usg.com for the most

up-to-date product information.

Trademarks

The following trademarks

used herein are owned

by United States Gypsum

Company or a related

made in writing to us within

thirty (30) days from date it

was or reasonably should have

been discovered.

Safety First!

Follow good safety/industrial

hygiene practices during

installation. Wear appropriate

personal protective equipment.

Read MSDS and literature

before specification and

installation.

888 STRUCTO (787.8286)

structo-crete.com

usgdesignstudio.com

Advertising