Rockwell Automation 21P-MISC-A-TP Transition Tube Kit #C19-6/7 For PowerFlex 755 w/OEM Liquid Cooling Fr 6/7 Drive User Manual

Page 2

Advertising
background image

2

PowerFlex 755 with OEM Liquid Cooling AC Drive Transition Tube Kit - Frames 6 and 7

www.rockwellautomation.com

Americas: Rockwell Automation, 1201 South Second Street, Milwaukee, WI 53204-2496 USA, Tel: (1) 414.382.2000, Fax: (1) 414.382.4444

Europe/Middle East/Africa: Rockwell Automation, Pegasus Park, De Kleetlaan 12a, 1831 Diegem, Belgium, Tel: (32) 2 663 0600, Fax: (32) 2 663 0640

Asia Pacific: Rockwell Automation, Level 14, Core F, Cyberport 3, 100 Cyberport Road, Hong Kong, Tel: (852) 2887 4788, Fax: (852) 2508 1846

Power, Control and Information Solutions Headquarters

5

Outlet

Transition

Tube

Inlet
Transition
Tube

Outlet

Transition

Tube

Inlet

Transition

Tube

6

O-ring

Fitting with Face Seal

O-Ring

Backup Wrench

Swivel Nut

7

Frames 6 and 7

Install o-rings on the inlet and
outlet transition tube male fittings.
Verify that the o-rings are fully
seated in the fitting grooves.

Frames 6 and 7

For each tube connection:

A. Place the transition tube

assembly against the
fitting body so that the flat
face of the brazed sleeve
is in full contact with the
o-ring.

B. Thread the nut by hand

onto the fitting body.

C. Using a backup wrench,

tighten to a torque of 81
N•m (60 lb•ft).

Frames 6 and 7

Installation completed as
shown at right.

(Frame 7 transition tubes shown)

(Frame 7 drive shown)

Publication 20GY-IN003B-EN-P – August 2011

Supersedes 20GY-IN003A-EN-P – June 2011

Copyright © 2011 Rockwell Automation, Inc. All rights reserved. Printed in USA.

*PN-121666*

PN-121666

Advertising