Step 7: installing the shields, Step 8: documenting the change – Rockwell Automation 20L PowerFlex 700L Frame 3A DC Bus Bar Conversion Kit User Manual

Page 6

Advertising
background image

www.rockwellautomation.com

Americas: Rockwell Automation, 1201 South Second Street, Milwaukee, WI 53204-2496 USA, Tel: (1) 414.382.2000, Fax: (1) 414.382.4444

Europe/Middle East/Africa: Rockwell Automation, Pegasus Park, De Kleetlaan 12a, 1831 Diegem, Belgium, Tel: (32) 2 663 0600, Fax: (32) 2 663 0640

Asia Pacific: Rockwell Automation, Level 14, Core F, Cyberport 3, 100 Cyberport Road, Hong Kong, Tel: (852) 2887 4788, Fax: (852) 2508 1846

Power, Control and Information Solutions Headquarters

U.S. Allen-Bradley Drives Technical Support - Tel: (1) 262.512.8176, Fax: (1) 262.512.2222, Email: [email protected], Online: www.ab.com/support/abdrives

Publication 20L-IN004A-EN-P – September, 2006

P/N 181694-P01

Copyright © 2006 Rockwell Automation, Inc. All rights reserved. Printed in USA.

Step 7: Installing the
Shields

1. Align six (6) holes in the Front Shield with holes in the top cover and

assemble six (6) plastic rivets. Apply force with the malleable hammer
as required to completely install the plastic rivets.

2. Align five (5) holes in the Rear Shield with holes in the top cover and

assemble five (5) plastic rivets. Apply force with malleable hammer as
required to completely install the plastic rivets.

Step 8: Documenting the
Change

1. Record the change on the Field Installed Option label. Use a marker to

write in the kit catalog number (SK-L1-DCBS1-F3).

2. Replace the power module lower front cover.

DANGER

PORT

POWER

STS

MOD

NET A

NET B

FIELD INSTALLED OPTIONS

Firmware

#:

Date

Firmware

20-HIM

28-IO-

20-COMM-

20B_-DB1-

HIM

I/O

COM Module

Internal Dynamic Brake

#:

Date

Power Module
Lower Front Cover
Cutaway

Advertising