Step 7: document the change, Document the change – Rockwell Automation 23P PowerFlex DC Stand-Alone Regulator (SAR) Capacitor Circuit Board User Manual
Page 9
Advertising
![background image](/manuals/577242/9/background.png)
Rockwell Automation Publication 23P-IN005A-EN-P - June 2011
9
Step 7: Document
the Change
1. Record the installation of the new capacitor circuit board and date of installation
on the field installed option label on the side of the SAR (as shown below).
2. Replace the SAR covers in the reverse order of removal. See
.
3. Install DPI cable (if present).
Advertising