Pen maintenance – Rockwell Automation 1492-PLTKIT Plotter Kit - User Manual User Manual
Page 55

Troubleshooting and Maintenance 4-3
Removing Sealing Unit from Pen Station
1. Open pen station by pressing the “Open/Close” button.
2. Apply the key (enclosed in the 1492-PLOTSERV) to the sealing unit
and carefully lift the sealing unit from the holding device.
Inserting and Adjusting Sealing Unit
1. Insert new sealing unit into pen station.
2. Carefully press the sealing unit up to the limit-stop in the aluminium
tube.
3. Using the key, adjust the sealing unit until the key is parallel with the
plotter surface. The opening on the side of the sealing unit should be
centered.
Exchanging Priming Plates (for starting plotter pen)
1. Remove the priming plates by pulling them out sideways.
2. Insert new priming plates by sliding them into the guide on the side of
the clamping device until the plates fit snugly.
Pen Maintenance
1492-PLOTPEN 25 and 1492-PLOTPEN 35 must be removed from pen
station, capped tightly and stored in the provided pen holder.