Building and installing cables – Rockwell Automation F-6300 Servo Motor Installation Instructions User Manual

Page 6

Advertising
background image

6

F-Series Motor Installation Instructions

Publication 1398-IN516B-EN-P — February 2002

Building and Installing Cables

Knowledgeable cable routing and careful cable construction improves
system ElectroMagnetic Compatibility (EMC).

To build and install cables, perform the following steps:

1. Keep wire lengths as short as possible.

2. Route signal cables (encoder, serial, analog) away from motor and

power wiring.

3. Separate cables by a minimum of 0.3 m (1 ft) for every 9 m (30 ft) of

parallel run.

4. Ground both ends of the encoder cable shield, and twist the signal wire

pairs to prevent electromagnetic interference (EMI) from other
equipment.

ATTENTION

!

High voltage can be present on the shield of a
power cable if the shield is not grounded.

Ensure there is a connection to ground for any
power cable shield.

Failure to observe these safety procedures could
result in personal injury or equipment damage.

Advertising