Installation requirements, Preparing the system, Insert the output rail – Rockwell Automation 1492-PRINT220 ClearMark Quick Start User Manual
Page 3
Advertising

3
Installation Requirements
• Operating Temperature: +68…95 °F (+20…35 °C)
• Power Source:
– Cat No. 1492-PRINT110: 100...120V, 50/60 Hz, 8 A
– Cat. No. 1492-PRINT220: 220...240V, 50/60 Hz, 4 A
Figure 2 - Printer Overview and Clearance Requirements - in. (mm)
Preparing the System
Figure 3 - Insert output rail
1. Insert the output rail
Maintenance Cover for Printing System
Ink Cartridge Cover
Operating and Control Panel Display
Maintenance Cover
for Waste Pad
Output Rail
Loader - Input
9.84”
(250 mm)
7.87”
(100 mm)
9.84”
(250 mm)
3.94”
(100 mm)
3.94”
(100 mm)
Advertising
This manual is related to the following products: