Rockwell Automation 2500 CENTERLINE Motor Control Centers IP54 Sealing Instructions User Manual

Centerline

Advertising
background image

1

Publication 2500-IN003A-EN-P—August 2007

Instructions

CENTERLINE

®

2500 Motor Control Centers

IP54 Sealing Instructions

For IP54 structures only

Procedure

1.

Remove the tube of caulking (mastic) sealer from the splice kit. Cut the
nozzle at the first notch, 3 mm (1/8”) from the end.

2.

Read the application directions on the tube. Apply a continuous bead of
caulking, 3 mm (1/8”) wide, around the outside edge of the sideplate of
the fixed motor control center. See Figure 1.

Figure 1 Correct Application of Caulking

Apply 3 mm (1/8”) wide
continuous bead of
caulking sealer. Do not
allow “skin” to form on
caulking before joining
the sections.

Advertising