Rockwell Automation 2500 CENTERLINE Motor Control Centers IP54 Sealing Instructions User Manual
Centerline
                                    Advertising
                                    
                                        
                                    
                                
                                 
1
Publication 2500-IN003A-EN-P—August 2007
Instructions
CENTERLINE
®
2500 Motor Control Centers
IP54 Sealing Instructions
For IP54 structures only
Procedure
1.
Remove the tube of caulking (mastic) sealer from the splice kit. Cut the 
nozzle at the first notch, 3 mm (1/8”) from the end.
2.
Read the application directions on the tube. Apply a continuous bead of 
caulking, 3 mm (1/8”) wide, around the outside edge of the sideplate of 
the fixed motor control center. See Figure 1.
Figure 1 Correct Application of Caulking
Apply 3 mm (1/8”) wide 
continuous bead of 
caulking sealer. Do not 
allow “skin” to form on 
caulking before joining 
the sections.
                                    Advertising
                    
                        
                    
                            
            
                            
                        Table of contents