Preliminary steps, Replacing the isolation board – Rockwell Automation 2364F RGU Isolation Board Replacement User Manual

Page 3

Advertising
background image

Publication 2364F-5.13 June 1999

RGU™ Isolation Board Replacement

3

Preliminary Steps

Before replacing the power supply, shut off the power; lockout/tagout the
unit; and wait five minutes for all voltage to discharge. Open the bay door
to the power structure.

Replacing the Isolation Board

1. Using a meter, test the voltage across the AC line, across the DC bus, and

across the terminals on the isolation board.

2. Put on the ESD wrist strap and attach it to the PE busbar (rear grounding

bar in the bottom of the unit).

3. Remove the Lexan™ guard (and its standoffs) from the isolation board.

4. Disconnect the ground connection from P1, the feedback connection

from J1, the ribbon cable from J2, and the current transducer connection
from J7 (as shown in Figure 1).

5. Disconnect the terminal blocks TB5 and TB6.

6. Turn the six mounting standoffs counterclockwise to loosen the board

and pull the board out.

7. Remove the burden resistors from each of the terminal blocks.

8. Place the isolation board in an anti-static bag.

!

ATTENTION: If there is any voltage present, remove the
source of the voltage. Check for voltages again before
proceeding to the next step.

Advertising