Determine mounting order – Rockwell Automation 2093-ASP06 Kinetix 2000 Shunt Module Installation Instructions User Manual
Page 4

4 Kinetix 2000 Shunt Module
Publication 2093-IN002A-EN-P - December 2006
Determine Mounting Order
Mount a shunt module in the order described below, and as shown in the figure.
Module Mounting Order
IMPORTANT
Mount the shunt module to the right of any axis modules (IAM or AM).
However, the eight-axis power rail (2093-PRS8S) requires the shunt module
be mounted in the rightmost slot.
WARNING
To avoid personal injury due to electrical shock, place a slot filler module
(catalog number 2093-PRF) in all empty slots on the power rail.
An unoccupied slot in the power rail will disable the Kinetix 2000 system, but
control ac power will continue to be applied to the power rail.
Power Utilization or Amp Rating
Lowest
Integrated Axis
Module
2093-AC05-MP5
Axis
Module
2093-AM01
Axis
Module
2093-AMP2
Axis
Module
2093-AMP2
Shunt
Module
2093-ASP06
Slot Filler
Module
2093-PRF
Seven-axis Power Rail Module 2093-PRS7 is shown.
Highest