Fg h i – Rockwell Automation 2100 Installing Ground Bus and Connectors User Manual
Page 4

Publication 2100-IN031B-EN-P - March 2003
4
Supersedes Publication 2100-5.20 - December 1991
© 2003 Rockwell International Corporation. Printed in the U.S.A.
Figure 2 Installing a Vertical Unit Load Ground Bus and Unit Load Ground
Connectors.
NOTE: Illustration only shows a portion of the vertical bus, vertical bus
cover, and right hand unit support.
Parts List for Kits 2100H-N79L,
2100H-N79LT:
c
Vertical unit load ground bus (1)
d
Unit load ground connector (6)
e
1/4-20 x 1/2” thread-forming screw (16)
f
#14 - #4 AWG lug (6)
g
1/4-20 x 5/8” hex head screw (6)
h
1/4” lock washer (6)
i
1/4”-20 hex nut (6)
Parts List for Unit Options -79L, -79LT:
d
Unit load ground connector (1)
e
1/4-20 x 1/2” thread-forming screw (1)
f
#14 - #4 AWG lug (1)
g
1/4-20 x 5/8” hex head screw (2)
h
1/4” lock washer (2)
i
1/4”-20 hex nut (2)
Vertical Bus Cover
FRONT
e
Slots May Not Exist on Older Versions -
If slots do not exist, position unit load
ground connector just past edge of
wireway opening.
d
c
Right Hand
Unit Support
Unit Support Pan
Tab
f
g
h
i