Startup/power on – Rockwell Automation 2727-G7P20D1Q7 MobileView Guard G750 Quick Start User Manual
Page 24
Advertising

24 MobileView Guard G750
Publication 2727-QS002E-MU-P
Startup/Power On
1. Attach the MobileView Connection Cable to the Junction Box Cable as
shown on page 14. Tighten threaded coupling until it is finger tight.
2. Check the MobileView terminal for a start-up screen.
If the start-up screen does not appear, check the 24V dc power source and
cable connections at the Junction Box and MobileView terminal.
TIP
An icon for RSView ME software appears on the MobileView
2727-G7P20D1Q6 and 2727-G7P20D3Q7 start-up screens only.
Advertising
This manual is related to the following products: