Rockwell Automation FlexPak Plus DC Drive Field Supply Kit for NRG, RG 14C237 User Manual

Page 5

Advertising
background image

Field Supply Kit for Non-Regenerative and Regenerative FlexPak Plus DC Drives

5

Step 10. For a full-wave supply, connect the motor field wires to terminals F1 and F2 on Field Supply terminal

block 2TB. See figure 3.

For a half-wave supply, connect motor lead F1 to terminal 51 on 1TB and motor lead F2 to terminal
F2 on 2TB. See figure 4.

Refer to the motor’s nameplate label and the technical specifications at the end of this instruction
manual to determine the appropriate field type required.

.

Step 11. Verify the wiring of the Field Supply kit and that all connectors are securely fastened.

Step 12. Replace the auxiliary mounting bracket removed in step 4.

Step 13. Reattach the cover to the drive.

Step 14. Apply power and test the operation of the drive.

This completes the installation of the Field Supply kit in a regenerative FlexPak Plus drive.

Figure 3 – Connecting the Field Supply (Full-wave)

Figure 4 – Connecting the Field Supply (Half-wave)

32

132

F1

F2

To F1, F2 on motor

AC

AC

+

2TB

1TB

51

52

32

132

F1

F2

To F2 on motor

AC

AC

+

2TB

1TB

51

52

To F1 on motor

Advertising