Scheduling report objects and reports – Rockwell Automation FactoryTalk Historian Classic User Guide User Manual
Page 101

Advanced Reporting Topics Chapter 6
The Report Name List dialog box appears.
8. Select the reports that you want to refresh, or select the
Refresh All Reports check box.
9. Click Update to refresh the selected reports and close the
dialog box.
10. Click
to save your workbook.
The Configuration Console allows you to schedule tasks to be run at
some time in the future. The scheduling feature allows the valuable
information in the Configuration Console to be used by the entire
company without the cost of a runtime user license. Any report in
the system can be scheduled as a task. The results of the task can be
saved to a file, sent to an e-mail address, or printed. With this
capability, you can set the Schedule Manager to e-mail report objects
to production supervisors every morning, or update your production
statistics in an HTML document that is referenced by your Web
server.
Scheduling Report Objects
and Reports
Rockwell Automation Publication HIST-UM001K-EN-E-June 2014
101