Rockwell Automation T3831 ICS Regent Communications Package for Winterpret User Manual
Page 16
 
Communications Package for W
INTERPRET
(T3831)
 
1 6  
Industrial Control Services
variable’s description. Configuring the Guarded Peer-Link is 
a three step process. 
Step 1: Select the projects that will participate in the GPL
communications. Use the Projects button to open a 
dialog to select the participating projects. 
Step 2: Define the GPL variables. Use the Add, Edit and
Delete Buttons to enter, change or remove a 
definition from the GPL variables list. 
Step 3: End the configuration process using the Save button
to save your changes and compile the Guarded Peer-
Link configuration and templates for each 
participating project. You may also choose Cancel to 
end the configuration without saving or compiling. 
Details of each of these steps is described below.
Selecting Projects for GPL Communications
When you choose the Projects button the dialog box shown in 
Figure 9 is opened. From this dialog you can select which of 
your projects that are defined in your W
INTERPRET
system
will participate in the GPL communications network. Each 
project is listed alphabetically by name and description. 
Projects that are selected to participate in the GPL 
communications are marked by and asterisk (*). 
Figure 9. Selecting Projects for GPL Communications.
Select one or more projects using the mouse or keyboard. Use 
the Select All button to select all of the projects. Choose 
Include to mark each selected project with an asterisk (*) to