Baumfolder BAUM18: Pile Folder 1st Station (from 2005 on) User Manual

Page 9

Advertising
background image

PAGE 9 TP10313

ELECTRICAL CONNECTIONS

1.0 Wiring the Pump (2018 / 1 phase)

Connect the pressure/vacuum pump at the pump

junction box (Figure 5) using the attached cable. Follow the

instructions below for the proper connections.

There are six wires from the control box to the pump.

Wire #1 connects to the terminal marked 1 in the pump

motor. Wire #2 connects to the terminal marked 4 in the

pump motor. Wires #3 ,#4 ,#5 & #6 are not used and should

be taped off separately. The green wire is the ground that is

attached to the motor frame.

1.1 Other Connections

Refer to the serial number plate for electrical

requirements. The serial number plate notes the voltage,

phase and hertz, minimum time delay fuse, total machine

amperage, and minimum wire conductor size for the main

power connection.

The main power is connected directly to the line side of

the main power switch. In a 2018 single phase use L1 and

L2 only.

All electrical connections are to be made by a certified

electrician. Refer to local building electrical codes for proper

and safe connections.

For the following items, refer to Figure 6. Run a power

cable from your distribution box to the main control box on

the pile feeder. Turn the main power switch to zero. Using

the appropriate tool, open the latches on the control box

door and open the door.

NOTE: The door is connected to the main box by a ground

wire that should not be removed.

Figure 5

1.2 Tapping the Transformer

Pass the power cable through the strain relief and the

hole provided in the control box. Connect the power cable

to the open terminals on the main disconnect in the control

box. The incoming ground wire should be attached to the

ground stud located in the lower right-hand corner of the

control box.

To tap the transformer, read the incoming voltage at the

main disconnect. Then move the wire numbered 11L1 on the

transformer to the corresponding tap on the transformer.

Tighten all screw connections and close the door before

switching the machine on.

A connector is provided for power connection to the

stacker. The stacker must be plugged into the socket for the

machine to operate, if not, install the blind plug attached to

the box.

A connector is provided for power connection to the

second station (8-page) fold unit. If no additional folding

station is to be connected, the connector must be closed off

with a blind plug.

1.3 Pump Connections

Connect the air hoses to the pump. The small diameter

hose is connected to the vacuum side of the pump. Connect

it to the barbed fitting above the ball valve on one end and

the other end to the vacuum solenoid valve on the pile

feeder.

Connect the larger diameter hose to the remaining

outlet port on the pump and to the barbed fitting on the pile

feeder at the end of the blow bar.

Troubleshooting tips and actions required for the

display messages that may appear on the control readout

may be found the "Diagnostic Messages" section of the

manual.