Gt diesel, Physical installation – Bully Dog 40420 gauge GT tuner User Manual

Page 29

Advertising
background image

GT

DIESEL

28

PhysICAl InstAllAtIon

Be sure to check the list and description of included parts on pages 4-6.

Brief Preview

This is a quick list of the basic installation steps. You can find more specific information about each step in the next section.

1. Connect the OBDII adapter plug to the port under the dash.
2. Plug in the power cable to the fuse box and connect it to the adapter plug.
3. Run the HDMI cable under the dash.
4. Mount and connect the GT.

GT & Windshield Mount

OBDII Adapter Plug

OBDII Port

Power

Wire

Fuse Box

Fire wall grommet

The illustration below shows how to install the power wire if there is no fuse box available inside the cab of the vehicle. If a fuse box is available inside the cab, there

is no need to run the power wire through the firewall into the engine bay.

Advertising